14 section 5 - installation Instructions 5.1 Boiler Packaging The boilers are supplied in different packagings: Boiler Flue System (separate) Hardware Pack (separate) 5.2 Fitting/Mounting the Boiler Decide where the boiler is to be fixed on the wall, taking into account installation requirements detailed in previous section. Screw the wall mounting plate to the wall choosing one of the two sets of slots in left and right bank. Ensuring that at least one of the screws is fitted into a top slot. Example of fixing 5.4 internal wiring The boiler has been pre-fitted with a 3 amp fused approved moulded 3 pin and flying lead for use with 230V 50Hz.

If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to avoid a hazard. The plug should be used with an unswitched/shuttered socket outlet complying with BS1363. The boiler comes pre-fitted with a link wire between the room thermostat/timer connections on the terminal strip. This creates a permanent call for heat and must be removed when adding a room thermostat. 4 Cable Clamp 2. Lift the boiler onto the wall mounting plate, locating it over the two tabs. Room Thermostat - Wiring To fit a room thermostat proceed as follows: 1.

Ensure that the electrical supply to the boiler is isolated before proceeding. Remove the two screws beneath the flap on the front of the boiler and lower the front panel. Remove the pre-fitted link wire between the Room stat/timer terminals. Cambridge silicon radio bluetooth driver windows 7 x64 iso. Pass the cable through a grommet, secure with the cable clamp and connect the room stat as shown in the diagram below.

Ferroli domina c 24 e pdf. Free Download e-Books dll RegOpenKeyExW. Repair Manual firmware masterizzatore dvd lg 2008-09-16 21 22 15 -D. For Heating and Hot. Integrated Boiler. FERELLA BOIL F 24 - 30 MEL. KEA AIR COMPACT E. Version - 09.2002.

If room stat has a neutral connection, connect this to terminal N (load) in the fused spur. Carry out all necessary electrical checks. Raise the front panel and relocate the two screws under the small flap. Check operation of room stat if possible. If present, remove the bottom end support packaging and ensure all plastic plugs are removed from CH & DHW connections.

5.3 Wiring InstruCTIons WARNING: THIS APPLIANCE MUST BE EARTHED Connections must be made in such a way that allows complete isolation of the electrical supply, e.g. Double pole switch with 3mm contact separating in both poles.

L N N Room Stat ROOM STAT/ TIMER 14 15 60 section 5 - installation Instructions 5.5 Water and Gas ConnectionS Ensure all boss blanking plugs are removed before making any connections. Each valve must be fitted to the correct boss as shown in diagram below Do not subject any of the isolating valves to heat as the seals may be damaged. Ensure that the green fibre washer is used on the CH flow connection.